Offrampcloud exit calculator

Worked example · Azure

An Azure subscription with VMs, managed disks and PostgreSQL.

VM sizes read straight from the meters, disks from their tier letters, a flexible PostgreSQL server sized as a vCore pool, and a Marketplace line left out. Read through the way the calculator reads it: the bill, what it becomes on Hetzner, the verdict, and what would change it.

The bill

$2,142 a month across 10 services after setting aside marketplace, tax, support plan, refund. The six largest lines:

ServiceGradeTodayOn HetznerChange
Virtual MachinesEasy$838$208saves $630
BandwidthEasy$348~$0saves $348
StorageEasy$335$159saves $176
Azure Database for PostgreSQLModerate$267$80saves $187
Azure MonitorModerate$180~$54saves $126
AKSModerate$72~$18saves $54

~ marks a rule-of-thumb ratio; the rest is priced from usage in the file.

What it becomes on Hetzner

  • 9 servers: 4× CX43, 1× AX42-1, 3× CX23, 1× CX53
  • $554/mo for servers, storage and traffic
  • 40 h/mo of engineer time, $3,000
  • $17,280 one-off, no payback at this net

Extra cost per year

$16,947

Not worth moving at this size. Hetzner costs more once someone is paid 40 hours a month to run it.

Grow first: at this size the hours decide, not the hardware. 5 of your 10 services move easily. 80% of the Hetzner figure is priced from your usage; the rest is ratio-priced services and engineer time, which is where the range comes from.

Likely range $4,528 more to $192 less a month. Hetzner list prices of 17 Oct 2026, default assumptions.

The same file on nine destinations

Net per year after engineer time, best first. No destination pays for this account; Hetzner loses least.

Hetzner−$16,947 over
Scaleway−$24,626 over
OVHcloud−$24,829 over
Vultr−$26,089 over
Hetzner (US)−$26,476 over
DigitalOcean−$27,347 over
Akamai (Linode)−$27,919 over
UpCloud−$29,275 over
Exoscale−$35,165 over

What would change the answer

  • Engineer time. 40 hours a month at $75/h is $3,000, 84% of the destination figure. Halve the rate or fold the work into an existing team and the verdict moves first.
  • Scale. Engineer time grows slowly with the number of servers; hardware grows with the bill. The same mix at three times the size usually flips a marginal answer.
  • Moving only part of it. The first wave (foundation: storage, traffic, edge) is Bandwidth, Storage, Load Balancer, Virtual Network: $546/mo for about 1 engineer days, with the databases left where they are.

Every one of these is a setting in the report. Open the example and change them.