Offrampcloud exit calculator

Moderate to move

RDS on DigitalOcean: what it becomes and what it costs.

On DigitalOcean, RDS becomes PostgreSQL / MySQL on DigitalOcean Droplets (Patroni or replicas, pgBackRest), or a DigitalOcean managed database. Same engines. On Hetzner you run it yourself; where the destination sells the managed engine (DigitalOcean, OVHcloud and Scaleway for most of them) it costs roughly twice the bare server, still well under today's price.

Effort grade

Moderate

Same software, self-hosted: you patch, back up and fix it

Cost after the move, before engineer time

40% of today

Modelled from instance hours; the remainder (IOPS, backup storage beyond the priced 1.5×) at 40%. db.m6g.large is $0.152/h = $111/mo vs CX33 (4 vCPU, 8 GB) €8.49.

Engineer time

6 h a month

To run the replacement: patching, backups, on-call. Plus about 5 engineer days for the move itself.

Other ways to replace it

The report lets you pick any of these per service; the figure and the grade follow.

  • Managed PostgreSQL / MySQL at DigitalOcean, or a DigitalOcean managed database

    Where DigitalOcean sells the managed engine, backups, failover and patching stay someone else's job. Roughly twice the bare server, still well under today's price.

    55% of today · Easy

  • Hosted Postgres elsewhere (Neon, Supabase, Crunchy Bridge)

    A managed Postgres vendor next to DigitalOcean: no operations, a modest saving, and cross-provider latency to watch.

    80% of today · Easy

In three modelled AWS accounts

What RDS costs in the modelled accounts and what the estimator makes of it on DigitalOcean, with the default assumptions. Not customer data.

AccountAWS /moDO /moChangePriced by
Early-stage SaaS$2,981/mo in total$461$214−$247usage model
Scale-up on Kubernetes$24,950/mo in total$4,600$1,576−$3,024usage model
Data-heavy platform$79,640/mo in total$7,800$2,808−$4,992usage model

Your own RDS line, from your export

Drop one month of your AWS cost export and the report prices every service, RDS included, on DigitalOcean list prices of 18 Oct 2026, net of the engineer time to run it. In your browser; nothing is uploaded.

Run my numbers